PFSA140 3BSE006503R1 | ABB | Dual bus power supply module
¥8,451.00
Module Number: PFSA140 3BSE006503R1
Product staus: Discontinued
Delivery time: In stock
Sales country: All over the world
Product situation: Brandnew , one year warranty
Product Size: 250*235*85mm
We may provide these service :Guidance manual /Datasheet/ Weight/ Size/ Orignal country/ Prodcuct COO & COM & COC
Certificate of conformity / Certificate of Origin / Certificate of Origin /Operation method
Delivery time/ Provide a one-year warranty / Brand New Original Authentic
Contact me: Sauldcsplc@gmail.com +8613822101417 SIMON
Have a good day! Thanks for watching my website!
Introduced Product:
kollmorgen RMB-10V2-SYNQNET
ABB 3BSE042244R1 PP826
EPRO 9200-00006N CON021
EPRO PR9376/010-011
PROSOFT MVI56-PDPMV1
ABB REF610C11LCLR
EPRO PR6423/003-030
BOSCH DCIO-2/MK-UL
GE TGT-S00N-1-1-CA
Description
PFSA140 3BSE006503R1 | ABB | Dual bus power supply module
- .Many products are not yet on the shelves please contact us for more products
- .If there is any inconsistency between the product model and the picture on display, the model shall prevail. Contact us for the specific product picture, and we will arrange to take photos in the warehouse for confirmation
- .We have 16 shared warehouses around the world, so please understand that it can sometimes take several hours to accurately return to you. Of course, we will respond to your concerns as soon as possible
PFSA140 3BSE006503R1 is a saying that dual bus is based on the requirements of the US T4 level (Tier4) standard. Figure 6 shows this dual bus UPS redundant power supply scheme. It can be clearly seen from the figure that each of the dual buses is not a single UPS, nor are they two, nor are they three, but rather a deletion number representing multiple units. At the current level of general UPS parallel connection, it should be 8 units. For example, at least 5 data centers in Taiwan use a dual bus power supply system with 8 parallel x 2. If the problem can be solved within the redundant parallel connection of 8 UPS, it is best not to easily use dual bus.
PFSA140 3BSE006503R1 when two single machine UPS can achieve 1+1 parallel redundancy, if we insist on using a dual bus solution at this time, not only will the number of devices increase exponentially, but also due to the introduction of the series function equipment STS, more fault points will be added to the energy channel, resulting in a much higher investment than when there is double 1+1 parallel redundancy, because STS is much more expensive than UPS of the same capacity, At the same time, it also loses the advantage of strong overload capacity when directly connected in parallel, and its reliability is also reduced compared to before.
PFSA140 3BSE006503R1 is well known, any solution and plan is conditional, with its specific usage environment and limitations. Therefore, it is necessary to use it everywhere without considering conditions, time, and location. Otherwise, not only will the expected goals not be achieved, but it will also result in twice the result with half the effort.
Mailbox:sauldcsplc@gmail.com |PFSA140 3BSE006503R1
www.abbgedcs.com | Qiming Industrial Automation| Simon +86 13822101417
Reviews
There are no reviews yet.