UR8FV | GE | data transmission controller
¥5,415.00
Module Number: UR8FV
Product status: Discontinued
Delivery time: In stock
Sales country: All over the world
Product situation: Brandnew , one year warranty
Contact me: Sauldcsplc@gmail.com +8613822101417 SIMON
Have a good day! Thanks for watching my website!
Introduced Product:
1336-BDB-SP30A
1336-BDB-SP2D
1336-BDB-SP2C
1336-BDB-SP2A
1336-BDB-SP29D
1336-BDB-SP29C
1336-BDB-SP29A
1336-BDB-SP28D
1336-BDB-SP28C
1336-BDB-SP28A
1336-BDB-SP27D
1336-BDB-SP27C
1336-BDB-SP27A
Description
UR8FV | GE | data transmission controller
- .Many products are not yet on the shelves please contact us for more products
- .If there is any inconsistency between the product model and the picture on display, the model shall prevail. Contact us for the specific product picture, and we will arrange to take photos in the warehouse for confirmation
- .We have 16 shared warehouses around the world, so please understand that it can sometimes take several hours to accurately return to you. Of course, we will respond to your concerns as soon as possible
Because UR8FV only calls the FCl02 diagnostic module, tE is determined by the execution time of FCl02. In order to analyze the execution sequence of FCl02 when calling FCl02 in OB86, FCl02 has been modified appropriately to collect data. These modifications mainly include: adding a collection status program segment at the beginning of FCl02; Collect jump conditions at the jump instruction. After manually triggering some faults, analyzing the obtained data resulted in the execution sequence of FCl02. Insert read system time function blocks at both ends of each code segment to measure the program execution time of FCl02 in segments. The results are shown in Table 1 (in the table, is the execution time of SFC58; t (2ss) 8 is the execution time of SFC58 twice; T ‘represents the remaining time; T (PC102) is the total execution time of FCl02.
The execution time of FCl02 in the measurement results is not equal to the sum of each time period, because the measurement accuracy of the reading system time function block can only reach l ms. However, it is not difficult to see from the table that the execution time of FCl02 mainly focuses on the operation of calling system function SFC58 to write data to ET200M (controlling slave switching). The number of calls to SFC58 is equal to the number of ET200M slave stations, so it can be approximated as tE=3 ms x ET200M slave stations.
There is a significant relationship between ts in equation (3) and the timing of the OB86 interrupt generated by the main CPU.
If the main UR8FV generates an OB86 interrupt before calling FB101 to perform the send function, the main CPU directly sends the fault status to the backup station when sending data. In this case, ts is the shortest, which is the time tt taken to send data once, i.e
Formula (4)
If the main UR8FV generates an OB86 interrupt after calling FBl01 to execute the send function, the main CPU must send the previous data before sending the fault status to the backup station. In this case, due to different times when the previous data was sent, ts will also receive different values.
a. If the previous data transmission has been completed and the status of the main station will be immediately sent before the main CPU adjusts the state FB 101 to perform the transmission function, then
Formula (5)
Mailbox:sauldcsplc@gmail.com |UR8FV
www.abbgedcs.com | Qiming Industrial Control | Simon +86 13822101417
We may provide the information of this product:
Guidance manual PDF /Datasheet/ Weight/ Size/ Orignal country/ Prodcuct COO & COM & COC
Certificate of conformity / Certificate of Origin / Certificate of Origin /Operation method
Delivery time/ Provide a one-year warranty / Brand New Original Authentic
Reviews
There are no reviews yet.